Moeller is looking to maximize the use of the existing outdoor areas on the landlocked all-boy campus. MSA is working with the school to plan and design a new outdoor Athletic Complex that includes a full NCAA regulation-width synthetic soccer field for games and practice, a new 350 meter multi-lane synthetic track for practice/training, and a synthetic football JV/Freshman game & Varsity practice field adjacent to the existing school. In addition, MSA is also working with the school to improve the Gallenstein Center, a large multi-purpose structure used for indoor physical education and athletic competition.